Concrete Slab Cost Calculator

Estimate concrete volume, premix bags and material cost for slabs, round footings, hollow tubes and walls. Enter your measurements, add an allowance, then compare your ready-mix quantity with a bagged-mix order.

Plan your quantities

Choose your units, enter the measurements and review the result. Open More options for the extra ordering controls. Select Calculate after changing the inputs.

Concrete Calculator

Choose a shape and units, enter your dimensions, and get concrete volume, bags, and cost instantly.

FeetInches
FeetInches
FeetInches
FeetInches
FeetInches
FeetInches
FeetInches
FeetInches
FeetInches
Volume (cubic feet)–
Volume (cubic yards)–
Volume (cubic meters)–
Estimated weight–
80 lb bags (incl. allowance)–
60 lb bags (incl. allowance)–
40 lb bags (incl. allowance)–
Material cost–
Estimated total (with waste)–

Estimates only. Bag yields: 80 lb = 0.60 cu ft, 60 lb = 0.45 cu ft, 40 lb = 0.30 cu ft. Concrete weighs about 150 lb/cu ft (2,400 kg/m3). Always confirm with your local supplier.

How to use this concrete slab cost calculator

  1. Measure the project. Measure inside the forms and use the actual planned concrete thickness. Break stepped foundations into separate sections. For tubes, measure both diameters; the inside diameter must be smaller.
  2. Choose units and enter product details. Use the custom yield field when your premix bag states a different volume. Use Compare estimate to check two thicknesses without losing the first result.
  3. Review the base estimate and ordering checklist. Check the final quantities against your supplier’s packaging and quote.

How the estimate is calculated

For a slab or wall, volume = length × width × thickness. For round footings, use π × radius² × depth. A hollow tube subtracts the inner cylinder from the outer one. Divide cubic feet by 27 for cubic yards; multiply by 0.0283168466 for cubic metres.

Worked example

A 20 × 12 ft slab at 4 in thick contains 80 cu ft, or 2.963 yd³ before waste. Adding 10% gives 88 cu ft, or 3.259 yd³ to order. At $150 per yd³, the material estimate is $488.89. At 0.60 cu ft per 80 lb bag, the adjusted order is 147 bags.

Before you order

Material cost excludes labor, reinforcement, pumping, delivery, tax and supplier minimum-load charges. Bag yield is product-specific. This is a quantity estimate, not a structural design.

Sources and assumptions

For measurement conversions, see NIST’s unit-conversion references. Material yields, density, coverage and allowances depend on the product and site; confirm them with your manufacturer or supplier. Example premix yields are documented in the QUIKRETE Concrete Mix #1101 data sheet; use the yield for the actual mix you buy. Read SlabCalc’s methodology and limitations.

Frequently asked questions

Do bag counts include the waste allowance?

Yes. The standard bag counts and custom-yield ordering checklist include the entered allowance. The base volume rows describe the measured geometry before that allowance.

Can I save or share this estimate?

Use Copy result for a text summary, Download CSV for a spreadsheet-friendly file, or Share estimate for a link containing your inputs. Compare estimate keeps up to three snapshots in this tab; they disappear when the page is reloaded.

Are the example prices current local quotes?

No. Prices are editable examples in USD, not live quotes. Replace them with a supplier price in the unit shown. Delivery, taxes, labor and project-specific services are separate unless a result explicitly includes them.